Project Overview

 

Water mains, Water main Appurtenances and Sanitary Force main for MTO 2013-6000
Nipigon River Bridge Replacement

2014

Owner: The Ministry of Transportation

Consultant: Engineering Northwest Ltd.

 Bot Ferrovial Nipigon Joint Venture

 

Project Description:

Supply and install approximately 840 meters of water main including hydrant sets, valves and connections.  Rock excavation for trenches and associated structures.  Supply and install 150 meters of sanitary force main.  Supply and install 2 valve chambers.